Although high-power high-bay lamps are also a type of high-bay lamps, it does not make any difference whether they are installed or not. Today we will take a look at the installation points of high-power high-bay lamps.
At the position where the high bay light needs to be installed, set the hook in advance. It should be noted that the hook should be used in conjunction with the hoisting ring, and the load-bearing capacity of the hook must exceed 30Kg when installing the hook. And do a good job of waterproofing and insulation; turn on the power after installation, and observe whether the high bay light can work normally. The main points of the installation of high-power industrial and mining lamps are as follows:
1. Tighten the lifting ring, the lifting ring is M20 thread.
2. Put the lifting ring into the hook and place it steadily.
3. Pay attention to the working environment temperature and store.
4. When installing the lamps, the wiring and wiring are sealed to prevent leakage.
5. When the external power line is connected, corresponding waterproof and leak-proof measures need to be taken.
6. When the lamps are used, they must not violate the fire protection regulations.
7. For installation, please find a professional electrician to connect the red wire with a 0.75mm2 three-core cable, which is the so-called live wire, the blue wire is the neutral wire, and the yellow wire is the ground wire.